Request a Quote Company:*Contact:*Phone:Email:* Address:* Street Address City State / Province / Region ZIP / Postal Code Information required of:*Field ApplicationShop ApplicationBoth Field and Shop ApplicationCity and state where project is located:*Project involves the following: Liquid Coatings Structural Steel Reinforcing Steel Piping Penstocks Tanks Vessels Ductile Iron Pipe Time Frame:Project to commence within 1 monthProject to commence within 2-6 monthsProject to commence from 6-12 monthsProject to commence over 12 months awayIndustry classification: Refinery Chemical plant Food processing plant Power plant (fossil) Power plant (nuclear) Power plant (hydro) Manufacturing plant Ductile iron pipe Lead abatement Other Surface preparation requirements: Sandblast Waterwash (<10,000 psi) Waterjet (>10,000 psi) Sponge blast Soda blast Clean blast Steel shot Remove existing coatings Not sure Coating/Lining requirements: Epoxy Urethane Waterproofing Enamels Coal tar Latex Not sure (need help) Approximate sq. footage involved:Less than 500500 to 2,5002,500 to 7,5007,500 to 15,00015,000 to 30,00030,000 to 60,00060,000 to 125,000Over 125,000Not sureApproximate budget:Less than $1,000$1,000 to $5,000$5,000 to $25,000$25,000 to $50,000$50,000 to $100,000$100,000 to $500,000$500,000 to $1,000,000Need helpComments/Questions Δ