Please fill in the form below or contact us directly at gregjeffress@abcptg.com.
Information required of:
Field Application Shop Application Both Shop and Field Application
City and state where project is located:
Project involves the following: Use the <Ctrl> key to select multiple choices
liquid coatings fusion bonded epoxy powder coating structural steel reinforcing steel piping penstocks tanks vessels ductile iron pipe
Time Frame:
project to commence within 1 month project to commence within 2-6 months project to commence from 6-12 months project to commence over 12 months away
Industry classification: Use the <Ctrl> key to select multiple choices
refinery chemical plant food processing plant power plant (fossil) power plant (nuclear) power plant (hydro) manufacturing plant ductile iron pipe lead abatement other
Surface preparation requirements: Use the <Ctrl> key to select multiple choices
sandblast waterwash (<10,000 psi) waterjet (>10,000 psi) sponge blast soda blast clean blast steel shot remove existing coatings not sure
Coating/Lining requirements: Use the <Ctrl> key to select multiple choices
protecto 401 epoxy urethane waterproofing enamels coal tar latex not sure (need help)
Approximate sq. footage involved:
less than 500 500 to 2,500 2,500 to 7,500 7,500 to 15,000 15,000 to 30,000 30,000 to 60,000 60,000 to 125,000 over 125,000 not sure
Approximate budget:
less than $1,000 $1,000 to $5,000 $5,000 to $25,000 $25,000 to $50,000 $50,000 to $100,000 $100,000 to $500,000 $500,000 to $1,000,000 over $1,000,000 need help
Comments/Questions: